This plan covers the 4 months from September to the end of the year.
This plan covers the 4 months from September to the end of the year.
Date Activity
2020
September 13th Finish moat banks - north, east and south side. minor clearing round ponds if time (leave pond 1 exclusion area)
September 27th Trim roadside hedge and remove brambles etc from area between hedge and boardwalk and entrance area.
October 11th Repair barriers to exclusion zone by pond 2. Pollard willow by edge of pond (and one at other end of barrier?) for stakes and hetherings to wind in.
October 25th Little stream valley – pull willowherb etc. cut back blackthorn near bridge and suckering shrubs along 'Gores' hedge
November 8th Hedge by picnic tables and hedge on Western boundary above moat
November 22nd Brambles along W boundary of F1 and elsewhere as needed. Remove long ones growing out into grass; cut and pull
December 13th Finish brambles in and around grassland in field 1 and anything else in F1 (maybe start copse?)
December 27th Decide nearer time if we have a work party